Talk:Development Roadmap: Difference between revisions

From
No edit summary
 
Line 5: Line 5:
* <del>Attend group work and regular company meetings</del>
* <del>Attend group work and regular company meetings</del>
* <del>Outreach prep</del>
* <del>Outreach prep</del>
==Assisting VillageKit -- stalled due to disagreement==
Just a quick note to say that I think these guys have a lot of potential.  I have a difficult time communicating with folks often enough, so please don't consider this status a blemish.  More likely a failure on my part.  --tim
Just a quick note to say that there seems to have been a second miscommunication around a purchase these folks pledged to make on behalf of Gridbeam and themselves.  --tim
* Automated drilling machine
** establish expectations
** <del>demo Replimat infrastructure, drill assembly mockup, detailed discussion of function</del>
** machine design
** prototype construction
** proving run
** develop operating procedures
** develop maintenance procedures
** develop safety precautions
** tabulate bill of materials and consumables, labor

Latest revision as of 20:34, 9 December 2021

Interns 2021

  • Developing an engineering pathfinder project in VR
  • Become familiar with the production toolchain
  • Load production code and operate production equipment
  • Attend group work and regular company meetings
  • Outreach prep